Click here to make tpub.com your Home Page

Page Title: Table 2-1. Preventive Maintenance Checks and Services (cont)
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 55-1905-223-24-7
Table 2-1. Preventive Maintenance Checks and Services
D-Daily
W-Weekly
M-Monthly
Q-Quarterly
S-Semiannually
AR-As Required
ITEM
INTERVAL
Items to be
NO.
D  W M Q S AR Inspected/Serviced
Procedures
6
o
RO Element - continued
v.
Turn off the RO unit.
CONT
w.
Prepare package #2 (citric acid) from the
cleaning kit into a mixing bottle and mix
thoroughly with unchlorinated product water.
x.
Add this solution to the RO unit as before.
y.
Turn on the main power switch and recirculate
for 50 minutes, as with solution #1.
z.
After 50 minutes, turn the cleaning valve to
the operational mode to divert the chemical
solution to drain.
aa. Turn off the RO unit.
bb. Reinstall the micron filter cartridges.
cc. Restart the RO unit and flush the system for
20 minutes with no back pressure.
dd. After 20 minutes, close the high pressure
bypass valve to bring the system pressure
back up to 800 psi and run for 5 minutes;
then, switch the power switch on the water
quality monitor to the ON position to resume
potable water production.
7
o
High Pressure Pump Motor Lubricate: refer to LO 55-1905-223-12.
8
o
Product Water
Check product water. Refer to paragraph 2-29.
a.
From the watermaker log, select a flow rate
representing normal flow, about 100 hours
after last cleaning of the pressure vessel
seawater element (membrane). Note the
temperature at which this flow was recorded.
2-11

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business