|
|
TM 55-1905-223-24-4
2-40. Replace/Repair Cylinder Head Group. (FIGURES 2-40 and 2-41)
This task covers:
a. Removal,
b. Repair,
c. Replacement.
INITIAL SETUP
Tools
Equipment Condition
Tool kit, general mechanic's
Power supply disconnected and tagged
rail and marine diesel engines,
"Out of Service".
Starter motor cable disconnected.
Torque wrench kit P/N 3377216
Fuel supply shut off. Fuel drained.
Lifting sling P/N 3375958
Coolant drained.
Combination wrench set, metric
Air cleaner removed (para. 2-25).
10mm thru 24mm,
Turbocharger removed (para. 2-26).
5120-01-046-4979
Fuel plumbing removed (para. 2-30).
Valve covers removed (para. 2-37).
Materials/Parts
Rocker levers removed (para. 2-38).
Fuel injectors removed (para. 2-39).
Gasket P/N 3907054
Warning tags, Item 21, Appendix C
Coolant, Item 4, Appendix C
WARNING
This procedure requires two soldiers.
REMOVAL
a. Remove the remaining 14 head bolts (1, 2, FIGURE 2-41) working from the center to the ends of the cylinder
head.
b. Remove cylinder head (3). Weight 80 lb (36 kg).
c.
Remove cylinder head gasket (4) from the block. Discard gasket.
REPLACEMENT
CAUTION
Make sure the cylinder head and block surface are clean and not nicked or gouged.
Change 1
2-102
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |