|
|
![]() TM 55-1740-203-13&P
P R E P A R A T I O N FOR STORAGE OR SHIPMENT
Section VI.
3-33.
GENERAL.
T h i s section contains information on preparation of transporter for storage
or shipment.
3-34.
STORAGE.
Perform PMCS in accordance with Table 3-1.
a.
Remove cable assembly from transporter, wrap in plastic and seal
b.
plastic with tape.
Secure wrapped cable assembly to rear transporter lockout strut with
c.
strapping.
Wrap exposed jack piston with plastic and seal edges with tape.
d.
F a s t e n jack h a n d l e s i n c l a m p s o n e a c h t r a n s p o r t e r .
e.
Wrap brake safety chain in plastic and seal with tape.
f.
S e t tire pressure to 25 psi and support off the ground on blocks in
g.
a warm dry environment.
3-35.
SHIPMENT.
Refer to paragraph 2-7 for transporter shipment.
a.
Refer to paragraph 2-8 for transporter shipment with shelter or con-
b.
tainer.
3-86
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |