|
|
TM 55-1740-203-13&P
Section V. MAINTENANCE PROCEDURES
Para.
Para.
F r o n t Wheel Bearings
Suspension Frame
Lockout Struts
and Seals
Turnbuckle
R e a r Wheel Bearings
C a b l e Assembly
and Seals
Reflector
Steering Center Arm
Parking Brake Handle
Hydraulic Jack
A x l e Frame
Cable
L i n e s and Hoses
B a n j o Suspension
B r a k e Shoes and Wheel Cylinders
Left and Right Shock
A b s o r b i n g Assemblies
Damper
T i e Rod Ends
Painting and Refinishing
W h e e l s and Tires
3-11. GENERAL.
This section c o n t a i n s m a i n t e n a n c e p r o c e d u r e s f o r a v i a t i o n u n i t m a i n t e -
n a n c e p e r s o n n e l . T h e procedure will consist of an initial set up descri-
b i n g all tools, t e s t e q u i p m e n t , r e f e r e n c e s equipment condition and per-
sonnel required. The procedures will provide detailed instructions for
each maintenance task.
3-12. SUSPENSION FRAME.
This task covers:
Removal
a.
b.
Cleaning
c.
Inspection
d.
Installation
INITIAL SET UP
Shop Equipment, Automotive, 4910-00-754-0654 and Tool kit, General
Tools :
M e c h a n i c s 5180-00-177-7033
Personnel
Required:
A light wheel vehicle/power generation mechanic
MOS63B
a.
R e m o v a l . (Refer to Figures 3-2, 3-3, and 3-4).
NOTE
Removal of front suspension frame shown, re-
m o v a l of rear s u s p e n s i o n f r a m e i s s i m i l a r .
GO TO NEXT PAGE
3-32
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |