TM 55-1730-228-13&P
4-31. SCISSORS, SCISSORS ARM ROLLERS AND SHAFTS - REPLACE
4-31
This task covers:
a. Scissors Arm Rollers and Shafts - Replace
b. Scissors - Replace
INITIAL SETUP
Equipment
Condition
Para
Condition Description
Replace Scissors Arm
Rollers and Shafts:
3-42
Guardrails removed.
3-35
Lift cylinders Removed
(If required).
4-25
Platform assembly.
removed (if required).
Replace Scissors:
4-25
Platform removed.
3-35
Lift cylinders removed.
3-38
Platform cylinder
removed.
3-43
Towing assembly
Materials/Parts
removed.
As Required
4-4" X 4" (same length as safety brace)
Hardwood Blocking (notched at both ends)
GAA Grease (Item 5, Appendix D)
Tools Required
Tool Kit, TI 5180-00-177-7033
Overhead Hoist (10 ton capacity) and Slings
Personnel Required
General Safety Instructions
MOS 63W, 1 Mechanic
Use a hoist and slings of suitable
lifting capacity.
GO ON TO NEXT PAGE
4-102
|