Click here to make tpub.com your Home Page

Page Title: SCISSORS, SCISSORS ARM ROLLERS AND SHAFTS - REPLACE
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 55-1730-228-13&P
4-31. SCISSORS, SCISSORS ARM ROLLERS AND SHAFTS - REPLACE
4-31
This task covers:
a. Scissors Arm Rollers and Shafts - Replace
b. Scissors - Replace
INITIAL SETUP
Equipment
Condition
Para
Condition Description
Replace Scissors Arm
Rollers and Shafts:
3-42
Guardrails removed.
3-35
Lift cylinders Removed
(If required).
4-25
Platform assembly.
removed (if required).
Replace Scissors:
4-25
Platform removed.
3-35
Lift cylinders removed.
3-38
Platform cylinder
removed.
3-43
Towing assembly
Materials/Parts
removed.
As Required
4-4" X 4" (same length as safety brace)
Hardwood Blocking (notched at both ends)
GAA Grease (Item 5, Appendix D)
Tools Required
Tool Kit, TI 5180-00-177-7033
Overhead Hoist (10 ton capacity) and Slings
Personnel Required
General Safety Instructions
MOS 63W, 1 Mechanic
Use a hoist and slings of suitable
lifting capacity.
GO ON TO NEXT PAGE
4-102

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business