|
|
TM 55-1730-228-13&P
4-30. PLATFORM - REPAIR (Continued)
4-30
NOTE
Use a hoist to take tension off platform.
a. DISASSEMBLY:
(1) Install slings on platform (1, Figure 4-36). Use care not to lift on scissors (2).
(2) Take slack out of slings.
(3) Remove nut (3) and lockwasher (4) from damaged roller(s) (5, 6, 7 or 8) from scissors (2). Remove roller(s).
b. INSPECTION:
(1) Clean all parts with cleaning solvent and dry with a lint-free cloth.
(2) Inspect moving parts for evidence of wear, burrs, nicks, chips, scoring and other damage.
(3) Replace damaged parts with new parts.
c. ASSEMBLY:
(1) Place roller(s) (5, 6, 7 or 8) in position in position in scissors (2) through track in platform (1).
(2) Install lockwasher (4) and secure with nut (3).
(3) Lubricate roller(s) with spray lubricant.
(4) Remove slings.
(5) Perform operational check for proper function.
END OF TASK
4-101
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |