|
|
TM55-1730-228-13&P
4-11. JUNCTION BOXES - REPAIR (Continued)
4-11
(2) Installation:
(a) Cut appropriate lengths of gasketing material.
(b) Remove adhesive backing tape.
(c) Starting at one corner of junction box cover (2), carefully place material (1) in position.
Figure 4-8. Fuse Replacement.
e. REPLACEMENT OF FUSES:
(1) Removal:
(a) Grasp each half of in-line fuse holder (1, Figure 4-8), push the halves together and rotate one half turn
counterclockwise.
(b) Remove fuse (2).
(2) Installation:
(a) Insert a new fuse (2) of the correct size and rating into the longer half of fuse holder (1).
(b) Align the two halves together, push in, and rotate one half turn clockwise.
END OF TASK
4-31
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |