TM55-1730-228-13&P
3-18. WIRING - REPLACE
3-18
This task covers:
a. Removal
b. Installation
INITIAL SETUP
Materials/Parts
Equipment
As Required
Condition
Para
Condition Description
Tools Required
3-17
Battery ground cable
Tool Kit, TI5180-00-177-7033
disconnected.
Personnel Required
MOS63B, 1 Mechanic
NOTE
See Foldouts, located in back of this manual, Figures OF-1, OF-2, OF-3 and OF-4 for
wiring schematics.
a. REMOVAL: Disconnect faulty wire(s) from terminal(s) as required.
b. INSTALLATION:
(1) Install wire(s) on proper terminal(s). Be sure good contact is made.
(2) Connect ground cable to battery. Refer to para 3-17.
(3) Install tiestraps as needed to keep wire(s) from rub points.
(4) Perform operational check for proper function.
END OF TASK