|
|
TM 55-1730-224-13 & P
Maintenance task are listed with, where-to-find detail procedures.
See Table 3-12.
Pallet and Bolster Maintenance Checklist
SEE
TASK
PARAGRAPH
LIST OF TASKS
NUMBER
Inspect (AVUM)
1
Check for loose or damaged pins
2
Check liqhts in operation (Refer to
figure 3-2 as necessary)
Replace (AVIM)
Perform tasks 1 and 2 then as needed
Remove pallet assembly
BOLSTERS (AVIM).
1. Remove self-locking nut (1),
flat washer (2), bevel washer
(3) and bolt (5).
2. Pull bolster (4) away from
frame. Repair as needed.
3. Position bolster (4) under
frame. Align holes.
4. Push bolt (5) in place.
5. Secure with bevel washers
(3), flat washer (2) and
self-locking nut (1).
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |