|
|
TM 55-1730-224-13 & P
Section II. Preventive Maintenance Checks and Services
Check tire pressure daily. See Table 2-2 for complete instructions.
NOTE
Within designated intervals, these checks
are to be performed in the order listed.
B-Before
A-After
M-Monthly
D-During
W-Weekly
Procedures
Equipment is
Not Ready/
Check for and have
repaired or
Available If:
adjusted as necessary
Jack is not
Check jack for loose-
ness or binding
secured
properly.
If mounting
Check all mounting
hardware is
hardware for damage
not tight or
or looseness.
is damaged.
If not
Check, and report to
AVUM.
properly
lubricated.
ment . Report any deficiencies using proper forms. See DA PAM 738-751.
Section III. Operation Under Usual Conditions
Coupling
1. Connect towbar (1) of trailer
to pintle hook (2) of tow vehicle.
2. Connect plug connector on
trailer to plug connector on tow
vehicle.
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |