Click here to make tpub.com your Home Page

Page Title: Figure 4-14. Breather Assembly-Exploded View.
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 746-10
Figure 4-14. Breather Assembly-Exploded View.
instructions in TM 38-230-2 for a type I (nailed) skid
appropriate  authority.
Stencil  on  main  door:
base. The crate, when fully assembled, is 204 inches by
"HUMIDITY INDICATOR ATTACHED TO INSIDE OF
97 inches by 92 inches. Position the shelter on the crate
DOOR." Secure tag or label to main entry door stating:
base and secure it, using suitable securing means.
"THIS EQUIPMENT PRESERVED WITH A 3-INCH
Wood blocking, secured to the base along the sides and
FREE BREATHING PORT THROUGH A DESICCANT
ends,  normally  provides  sufficient  securement.
BED.
FOR STORAGE OR RESHIPMENT THE
Assemble the crate panels to the base. Using cement-
HUMIDITY INDICATOR WILL BE INSPECTED AND, IF
coated nails, 16d, follow instructions provided in TM 38-
NECESSARY, THE DESICCANT REPLACED."
230-2 for assembly of the crate.
(7) Complete log book, preparation instruction
sheets, and other required forms; place inside a
watervaporproof bag; and secure to the container
(6) Apply markings to the crate per paragraph 3-5.
Apply special markings as follows and as directed by
4-57

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business