Click here to make tpub.com your Home Page

Page Title: PMCS PROCEDURES.
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 55-8145-203-13&P
4.4 PMCS PROCEDURES.
4.4.1 Your Preventive Maintenance Checks and Services, Table 4-1, lists inspections and care required to keep the container in
good operating condition. It is set up so you can make your BEFORE (B) OPERATION checks as you walk around the container.
4.4.2 The Interval column of table 4-1 tells you when to do a certain check or service.
4.4.3 The Procedure column of table 4-1 tells you how to do required checks and services. Carefully follow these instructions.
NOTE
Terms "ready/available" and "mission capable" refer to same status: Equipment is on hand and ready to perform
its combat missions. (See DA PAM 738-750.)
4.4.4 The Equipment Is Not Ready/Available column in table 4-1 tells you when your container is not mission capable and why
the container cannot be used.
4.4.5 If the container does not perform as required, refer to Section IV, Troubleshooting.
4.4.6 If anything looks wrong and you cannot fix it, write it on your DA Form 2404 and immediately report it to your supervisor.
4.5 PMCS TABLE.
Table 4-1. Unit Preventive Maintenance Checks and Services For Tricon Container
NOTE
All procedures should be performed both before and after the container is used.
Location
Item
Not Fully Mission
Interval
Item to Check/
Procedure
Number
Capable If:
Service
Before
Container, All panels
Inspect side, front, and door panels for
Holes exist in any panels.
1
holes.
Before
Container, All welds
Inspect all welds at corners and along
Any welds are damaged.
2
the corner posts. Inspect all welds that
attach the lockrod assemblies to the
door assembly.
Before
Door handles and
Inspect for any broken welds or
Handles or related hardware
3
related hardware
defective parts. Operate handles.
are broken or if handles will
not open door.
4
Before
Document holder
Inspect for any large dents that may
Document holder cannot be
prevent the holder from being
completely opened or closed.
completely opened or closed.
5
Before
Shelf assembly
Inspect for cracked or broken welds.
Any welds are cracked or
broken.
Before
Support beams
Inspect support beams for complete
Any welds or clips are
6
welds and working clips.
defective.
7
Before
Door seals
Inspect for tears.
Door seals are torn.
Before
Vents
Inspect for broken vents.
Vents are broken.
8
Change 1

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business