Click here to make tpub.com your Home Page

Page Title: Table 3-1. Inspection Requirements.
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 55-4920-325-14&P
Table 3-1. Inspection Requirements.
Major Assembly
Item
Item, or Area
Requirement
Each Operation Inspection
Test set front panel.
Operate switches and
Controls
controls. Perform-
ance should be
smooth and positive.
Detents should hold
switches firmly in
selected position.
Test set front panel
Check that power
Indicator Lamp
indicator lamp
lights when Power
ON/OFF switch (2,
figure 2-1) is set to
ON.
Inspect connectors for
Test set front panel and
Electrical Con-
bent pins, damaged
accessory cables.
nectors and
shells, worn or
Cable Assem-
frayed wiring.
blies
Test set front panel.
Check for cracked or
Indicators
shattered glass.
Daily Inspection
Inspect for loose or
Test set, general.
Hardware
missing hardware.
Test set front panel.
Check that proper
Fuses
fuse is installed in
fuse holder.
Intermediate Inspection
Check for dented or
Test set exterior.
Transit Case
sprung cover on
case.
Periodic Inspection
Check for grease,
Test set and cable assemblies,
Test Set
dirt, dust, or
grime.
3-4

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business