Click here to make tpub.com your Home Page

Page Title: Figure 7-3. Blocking, bracing and tiedown material for standard flatcar.
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

25 August 1988
TM 55-2320-280-14
NAIL PIECE A TO PIECE B WITH
12d NAILS, THEN NAIL TO CAR
FLOOR THROUGH PIECE B WITH
FIVE 20d NAILS. NAIL THE OTHER
2" X 4" PIECES EACH TO THE
ONE BELOW IN THE SAME
Figure 7-3. Blocking, bracing and tiedown material for standard flatcar.
Table 7-1. Materials Required to Ship HMMWV on Wood-Deck Flatcar
Item
Description
Approximate
quantity
Lumber ...................................
Douglas-fir, or equivalent; straight-grain, free of material de-
fects; Fed Spec MM-L-751c: ...............................................
2 x 4 x 36 in ............................................................................. .
12
2 x 6 x 26 in ..............................................................................
4
6 x 8 x 24 in ..............................................................................
8
Nails .......................................
Common, steel; flathead; bright or cement-coated, table X1-b,
Fed Spec FF-N-105a: .........................................................
12d ...........................................................................................
80
40d ...........................................................................................
64
Wire rope ...............................
6 x 19, IWRC; improved plow steel; preformed, regular-lay; ta-
52 feet.
ble X, Fed Spec RR-W-140C; 1/2-inch ................................
Clamps...................................
Wire rope, U-bolt clamps, saddled, single-grip, steel, Crosby
24
heavy-duty, or equal; Fed Spec FF-C-450c, 1/2-in. dia..
Thimbles ................................
Standard, open-type, 1/2-in. ......................................................
8
Turnbuckles ............................
Standard type, FSN 5340-01-121-1961, 3/4 x 12 in. ..................
2
Cushioning material.
Waterproof paper, burlap, or suitable material ...........................
As required.
Come-along............................
Tool, tensioning device, mechanical ..........................................
1
(2) Step 2. Fabricate four tire sidewall blocks in accordance with blocking pattern 89 in figure 7-3.
Place cushioning material between tire and sidewall block and between railcar floor and sidewall block. Follow
the instruction in figure 7-3 for nailing sidewall blocks to railcar.
c. Tiedown of the HMMWVs will be as follows:
7-4

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business