|
|
TM 9-6920-746-12&P
Section II. PREVENTIVE MAINTENANCE CHECKS AND SERVICES
(PMCS)
2-2. GENERAL.
NOTE
Always keep in mind the warnings and cautions.
a. Before You Operate. Perform your before (B) PMCS.
b. During Operation. Perform your during (D) PMCS.
c. After Operation. Perform your after (A) PMCS.
d. If Your Equipment Fails to Operate. Refer to troubleshooting table in chapter 3. Report any deficiencies using
the proper forms. See DA PAM 738-750.
2-3. PMCS PROCEDURES. The PMCS table 2-1 lists those required checks and services to be performed by personnel
who operate the M2 practice bolt. The table is divided as follows:
2-1
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |