Click here to make tpub.com your Home Page

Page Title: SYSTEM (LONG-TERM) POWER-DOWN PROCEDURE (Continued)
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 9-6920-737-10
SYSTEM (LONG-TERM) POWER-DOWN PROCEDURE (Continued)
4.
At emergency light (4) set toggle switch (5) to OFF position and observe emergency lights go out.
5.
In Trainer Shelter at emergency light (6) set toggle switch (5) to OFF position and observe emergency lights go
out.
6.
Open Integration Shelter door.
NOTE
Integration Shelter Air Conditioner and lighting will go off and emergency light will light when step 7 is performed.
7.
Open Utility Power Distribution Panel door (7) and set the four circuit breakers (8) to OFF position.
8.
Set main circuit breaker (9) to OFF position and close panel door.
WARNING
Use caution when leaving the shelter to avoid personal injury. All shelter lighting will be off after step 9 is performed.
9.
Locate emergency light (10) and set toggle switch (5) to OFF position.
10.
Leave Integration Shelter and lock the door.
11.
Make sure remaining shelter doors are locked.
12.
Make sure that organizational maintenance is notified that the U-COFT System is completely powered-down.
Change 1 2-208

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business