|
|
TM 9-6920-737-10
ELECTRONIC EQUIPMENT POWER-DOWN PROCEDURE (Continued)
20.
At the GPC Control Panel (A) turn keyswitch (B) to OFF position (fully counterclockwise) and observe that the
panel
lights go off.
21.
Make sure AUTO RESTART rocker switch (28) is set to OFF position.
22.
At SPC Power Management Panel (29) set AC MAIN POWER circuit breaker (30) to OFF.
NOTE
If RMS has been powered-up, perform RMS Power-Down Procedure (see 2-204).
To place system in overnight or weekend shutdown, see 2-205. For complete system (long-term) power-down, see 2-
207.
23.
thru 26. (deleted)
Change 1 2-203
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |