|
|
TM 9-6920-361-13&P
CHAPTER 6
DIRECT SUPPORT MAINTENANCE REPAIR
INSTRUCTIONS
Section I. GENERAL MAINTENANCE
specific requirements.
6-1. General.
a. This section contains those procedures which
c. If a required new part is not available, a
are of a general nature. Reference will be made to
reconditioned used part may be substituted. Such
pertinent paragraphs in this section in the repair
reconditioned used parts should approximate the finish
sections, in order to eliminate constant repetition of
of corresponding new parts. Allowable tolerances must
general instructions. Special reclamation instructions are
not be exceeded. Remove all burs and rough spots with
contained in pertinent repair paragraphs.
a fine stone or crocus cloth.
b. In sections II through V, major assemblies are
d. Redrilling and filing of all replacement parts,
disassembled,
repaired,
overhauled,
replaced,
except bolts, is permitted to obtain proper fit.
assembled, and given a final inspection.
These
instructions are supplementary to instructions for
6-4. Use of Tools.
operator and organizational maintenance, which are
covered in preceding chapters.
a. Care must be exercised to use tools that fit and
are suitable for the task to be performed, in order to
6-2. Disassembly and Assembly Procedures.
avoid unnecessary mutilation of parts and/or damage to
tools.
a. In disassembling an assembly, remove the
major
subassemblies,
whenever
possible.
b. Keep tools clean and work with clean parts. The
Subassemblies may then be disassembled, as
rules of good housekeeping must be observed.
necessary, into individual parts.
6-5. Welding. Refer to TM 9-237.
b. During assembly, subassemblies should be
assembled first and then installed to form a complete
assembly. Lubricate parts that are normally lubricated
6-6. Repairing Damaged Threads. Repair damaged
with aircraft and instrument grease (GL) before
threads with a thread restorer or by chasing on a lathe.
assembly.
6-7. Painting. Refer to TM 43-0139.
c. Complete disassembly of an assembly is not
always necessary in order to make a required repair or
6-8. Cleaning. Refer to TM 9-208-1 and 9-208-2.
replacement. Good judgment should be exercised to
keep assembly and disassembly operations to a
6-9. Finished Surfaces. All painted or treated surfaces
minimum.
will be refinished to match the appearance of new parts
as outlined below.
d. Maintenance functions to be performed are
outlined in appendix B.
Disassembly will follow
a. Paint all surfaces on
which
paint
has
numerical sequence in the illustrations, assembly will
deteriorated or become damaged.
follow reverse order of numerical sequence in the
illustrations.
b. Do not paint working parts inside groups or
mechanisms. Lightly lubricate such components in
6-3. Replacement of Parts.
accordance with paragraph 3-4.
a. Replace all damaged screws, nuts, pins, or snap
c. Do not paint polished machine-finished surfaces.
rings.
b. Replace all springs, if they are broken, kinked,
bent, if they fail to function properly, or if they fail to meet
6-1
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |