|
|
TM 9-6685-202-14
lever (12).
KEY to fig. 4-7
(5) Remove correcting lever (12) from vernier
1.
Nut, gland HIC 10-10-06-B
slide (31) by removing correcting lever screw (13).
2.
Washer, tube cup HIC 10-10-17-A
(6) Pull the sighting ring slide (21) and
3.
Packing 0-ring, hydraulic HIC 10-1018-A
attached items out of the grooves on the vernier slide.
4.
Packing, 0-ring, tube cushion HIC 1010-22
(7) Remove vernier (14) secured by two
5.
Nipple subassembly HIC 10-11-00
fillister head machine screws (15).
6.
Gasket HIC 10-10-12-A
(8) Remove lamp (16) from light bracket
7.
Plug, shipping HIC 10-10-01-A
(17).
8.
Gasket HIC 10-10-12-A
(9) Remove light bracket (17) from sighting
9.
Lid, cistern HIC 10-10-11-B
ring (18) by removing fillister head machine screw (19).
10.
Gasket, cistern HIC 10-10-10-C
(10) Remove sighting ring (18) secured by two
11.
Cistern HIC 10-10-13-B
fillister head machine screws (20) from sighting ring
slide (21).
12.
Nut, cistern HIC 10-10-03-A
(11) Remove contact strip (22) secured by two
13.
Gasket HIC 10-10-12-A
fillister head machine screws (23) and contact insulating
14.
Stud, cistern HIC 10-10-02-A
strip (24) secured by one socket head cap screw (25).
15.
Screw, stop HIC 10-10-05
(12) Pull magnifier (26) out of magnifier post
16.
Screw, mercury locking HIC 10-10-04
(27) and remove post by removing socket head cap
17.
Base, barometer HIC 10-10-14-B
screw (28).
(13) Remove vernier strip (29) secured by two
NOTE
fillister head machine screws (30) to vernier slide (31).
Key numbers shown below
in
parenthesis, refer to figure 4-7.
4-17
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |