|
|
ARMY
TM 9-6650-235-13&P
MARINE CORPS
TM-08552A-13&P
2-9. PREPARATION FOR MOVEMENT.
a. Remove the M3 Borescope (1) from the cannon
bore (2) with adequate support being provided during
removal, or remove from bore through disassembly of
the borescope by sections.
WARNING
The illuminating head assembly
presents a shock hazard if the M3
Borescope is not unplugged during
disassembly.
b. Turn off the electric light control (3) and/or switch
(4), and disconnect the 115-V electrical power cable
assembly (5) or 24-V electrical power cord adapter
assembly (6), 115-V electrical power cable assembly (5),
and associated electrical branched cord assemblies from
the power source.
c. After 24-volt operation on early configuration,
unscrew connector (7) of 24-V electrical power cord
adapter assembly (6) from plug (8) of adapter tube
assembly (9) and unscrew connector (10) of 115-V
electrical power cord assembly (5) from plug (11) of 24-V
electrical power cord adapter assembly. Then unplug
black 115-V electrical power cable from which ever
electrical branched cord was used.
d. After 24-volt operation on late configurations,
unscrew connector (10) of 115-V electrical power cable
assembly from plug (8) of adapter tube assembly (9).
Then unplug black 115-V electrical power cable
assembly from whichever electrical branched cord was
used.
e. After 115-volt operations, disconnect connector
(10) of 115-V electrical power cable from plug (8) of
adapter tribe assembly (9) and store in borescope optical
case.
2-17
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |