|
|
TM 9-4931-710-14&P
5-8
COLLIMATION
AND
INSPECTION
--
CONTINUED
SETTING
UP
COLLIMATION
STANDARD
--
CONTINUED
D Install head assembly (7) to collimation standard (2). Make sure ground surfaces (8) is parallel to
locating dovetail (9).
E Install three screws (10), tighten lightly.
Note
Use two V-blocks when setting up Ml 39 standard.
Dowel pins are matched and should not be separated.
F Set collimation standard (2) on V-block(s) (11) with dovetail positioned to accept the two 1/4
in. (6.4 mm) dowel pins (12).
5-20
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |