Click here to make tpub.com your Home Page

Page Title: Figure 7-2. (Sheet 5 of 5)
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TROUBLESHOOTING PROCEDURES
q Continue with operator assisted self-test
q Power down test set,
. Set TEST SET POWER switch (1) to OFF.
q Refer to figure 6-2.
q Remove
from
. Refer to volume IV, para. 2-12.
circuit card assembly Al,
q Replace
q Refer to TM 9-1200-206-34-2-2,
para. 3-8.
q Install
into
"
q Refer to volume IV, para. 2-12.
. Power up test set.
. Set TEST SET POWER switch (1) to ON.
q Run operator assisted self-test to the end of
test block 21.
q Refer to figure 6-2.
Does message display read
FAIL CODE 0.0.0.2
q Continue with operator assisted self-test.
q Test set cannot be
at this
I
. Refer to figure
q Turn in test set to next higher level of
maintenance.
Figure 7-2. (Sheet 5
5)
7-9
Volume Ill

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business