Click here to make tpub.com your Home Page

Page Title: Test Stand Shutdown
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 9-2920-258-30&P
NOTE
Z The voltage has to be adjusted to 28 volts when any part of a load is added. Check the AC ammeter.
While watching the AC ammeter, rotate the phase select switch through A, B and C positions. There
should be no more than a 1-ampere difference between each phase.
Check the AC voltmeter. While watching the AC voltmeter, rotate the select switch through the T1, T2;
T1, T3; and T2, T3 positions. There should be no more than l-volt difference between each circuit.
10 Using a multimeter, place the red lead on terminal "ac" and ground the black lead. Check for 12-
16 volts AC.
11 If the Alternator meets the above requirements, it is serviceable.
e
Test Stand Shutdown
CAUTION
Do not turn master load switch OFF first as damage to equipment may result.
1 Turn the ignition switch OFF.
2 Turn the master load switch OFF.
3 Turn the battery switch OFF.
4 Reduce test stand speed to 1000 rpm.
5 Depress the STOP button.
6 Return all switches and controls to the base setting.
7 Remove the Alternator and regulator from the test stand.
8 Place all leads in the storage compartment of the test stand.
D-16

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business