NOTE
Z The voltage has to be adjusted to 28 volts when any part of a load is added. Check the AC ammeter.
While watching the AC ammeter, rotate the phase select switch through A, B and C positions. There
should be no more than a 1-ampere difference between each phase.
Check the AC voltmeter. While watching the AC voltmeter, rotate the select switch through the T1, T2;
T1, T3; and T2, T3 positions. There should be no more than l-volt difference between each circuit.
10 Using a multimeter, place the red lead on terminal "ac" and ground the black lead. Check for 12-
16 volts AC.
11 If the Alternator meets the above requirements, it is serviceable.
e
Test Stand Shutdown
CAUTION
Do not turn master load switch OFF first as damage to equipment may result.
1 Turn the ignition switch OFF.
2 Turn the master load switch OFF.
3 Turn the battery switch OFF.
4 Reduce test stand speed to 1000 rpm.
5 Depress the STOP button.
6 Return all switches and controls to the base setting.
7 Remove the Alternator and regulator from the test stand.
8 Place all leads in the storage compartment of the test stand.