Click here to make tpub.com your Home Page

Page Title: TROUBLESHOOTING PROCEDURES-continued
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 9-2920-258-30&P
2-5
TROUBLESHOOTING PROCEDURES (cont.)
b Perform the test stand procedures in accordance with Appendix D.
c Inspect the Alternator as follows:
1
Check for missing Iockwashers, and missing or loose screws. Check all parts for
security of attachment. Replace missing hardware and tighten loose parts.
2
Check leads on brushes that they are not broken, cracked, frayed or oil soaked.
For removal, refer to Chapter 3, Disassembly Step 12.
Replace drive blocks if cracked, worn or warped.
3
4
Replace rotor assembly if cracked. Replace rotor assembly if there is a chipped or
scratched area too deep to be sanded with an abrasive crocus cloth (ref Appendix
C, Item Number 1).
Remove bearings (ref Chapter 3, Disassembly Steps 10 and 14). Check for
5
cracks or wear. Replace if necessary (ref TM 9-214).
Replace terminal leads if burned, bent or broken (ref Chapter 3, Disassembly
6
Step 12).
2-2

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business