Click here to make tpub.com your Home Page

Page Title: Section II. PN 2260AC AND A0012266AA (Leece-Neville)
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 9-2920-257-30&P
Section II. PN 2260AC AND A0012266AA (Leece-Neville)
2-3. TROUBLESHOOTING PROCEDURES
a. After the direct support unit receives the generator, make a preliminary inspection: before installation on an
engine, or when there is an unknown cause of failure.
b. Discover the cause for failure, then disassemble and repair before proceeding with prescribed tests. Performin g
additional operational tests on a damaged generator will only increase the damage.
Table 2-1. Generator Troubleshooting
MALFUNCTION
TEST OR INSPECTION
CORRECTIVE ACTION
GENERATOR FAILS TO CHARGE, OR OVERCHARGES, OR RUNS AT FULL FIELD VOLTAGE.
NOTE
Complete all steps in troubleshooting procedure unless otherwise indicated,
because one type of fault condition can cause other fault conditions and more than
one generator component could be defective.
Step 1.
Remove cover plate, connector assembly and mounting plate, and printed circuit panel assembly, brushes
and brush holder in accordance with paragraph 3-3b.
Step 2.
Refer to figure 3-2 and remove three nuts (10) and six rectifier leads from three stator terminal studs.
2-2 Change 1

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business