Click here to make tpub.com your Home Page

Page Title: Operational Test Procedure.
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 9- 2920- 224- 34&P
-
-
-
OPERATIONAL TESTING OF THE GENERATOR - CONTINUED
-
0011 00
j.
Clean all polishing residue from brushes and commutator by blowing with compressed air.
k.
Disconnect generator brush run--in setup.
2. Operational Test Procedure.
NOTE
Operational test results specified are for testing at room
ambient temperature (about 800 F).
a. Generator (11642898) must have a forced--air supply ducted to air inlet housing (1) for cooling throughout
operational testing. Air supply should deliver about 150 cu. ft. per minute.
b. Generator (10889713) must have connector (2) on its cooling fan motor electrically connected to test setup
power supply (A pos, B neg). Fan motor will draw about 11 A at 24 V dc.
c.
Mechanical connection to generator drive shaft (3) must couple generator to drive mechanism (as in test
stand) capable of turning generator armature at 6500 rpm (counterclockwise) with generator producing 300 A
at 30 V dc.
0011 00- 2
-

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business