|
|
TM 9- 2920- 224- 34&P
-
-
-
ASSEMBLY OF THE GENERATOR - CONTINUED
-
0010 00
d. Check brush spring tension as follows:
NOTE
Side of brushes to which the flexible lead is attached
must be away from spring coils.
1) Using brush spring lifter (5), to move torsion spiral springs (6) as necessary to install a new electrical
contact brush (7).
2) Lift ends of springs (6) into position in metal shoes on brushes (7).
3) Hook spring tester (8) under spring loop and maintain a gradually increasing pull perpendicular to a radius
from spring fulcrum (9) until end of spring just lifts off brush (7). Force necessary to lift each spring just off
a new brush shall be 52 to 60 oz. If any springs are defective, replace entire set from kit.
4) Repeat spring force measurement procedure for other spring (6) at this location.
5) Move new brush (7) to each of five other brush positions and repeat procedure as necessary to measure
tension of ten more springs (6).
0010 00- 11
-
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |