|
|
TM9-2815-224-34&P
Blower Maintenance Instructions (Cont)
(40) Turn blower (7) upside down and
place 0.004-in. (0.102 mm) feeler gage
between rotor lobes (29 and 30).
Rotate rotors while gage is installed.
(41) Remove feeler gage.
NOTE
To increase or decrease gap between trailing edge of right rotor lobes and leading
edge of left rotor lobes, do steps (42) through (45).
(42) Install puller tool on left timing gear (23) with two screws.
(43) Install puller tool on right timing gear (22) with three screws.
NOTE
Place clean, folded shop towel between blower rotors to keep gears from turning.
14-29
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |