Click here to make tpub.com your Home Page

Page Title: Follow-on Maintenance.
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 9-2815-224-34&P
Fuel Injector Maintenance Instructions (Cont)
12-2. FUEL INJECTOR REMOVAL/INSTALLATION (CONT).
Make sure clamp does not interfere with injector spring or valve springs.
Interference of clamp with spring travel can cause damage to components.
(5) Install clamp (8), screw (9), and convex washer (10). Tighten screw to 20 to 25 lb-ft (27 to
34 Nm).
(6) Check injector control rack (7) for free movement. Loosen screw (9) if injector control rack is too
tight to allow easy checking. Retighten to 20 to 25 lb-ft (27 to 34 N-m).
c. Follow-on Maintenance.
(1) Install rocker arms (para 7-5).
(2) Install engine brake retarder (para 11-2).
(3) Adjust exhaust valve clearance (para 19-4).
(4) Adjust fuel injector timing (para 19-4).
(5) Adjust injector rack control lever (para 19-6).
(6) Install rocker covers (TM 9-2320-279-20).
END OF TASK
12-4

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business