Click here to make tpub.com your Home Page

Page Title: Removal-continued
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 9-2815-224-34&P
Valve Mechanism Maintenance Instructions (Cont)
NOTE
Fuel pipes have changed from flare style to preformed packing style pipes and
connectors. Use new style pipes and connectors to replace old style pipes and
connectors. Refer to TM 9-2320-279-24P for parts identification.
Flare and preformed packing style pipes and connectors are not interchangeable.
When replacing one flare type pipe or connector, all pipes and connectors must be
replaced with new preformed packing style pipes and connectors.
Tag and loosen four fuel tube nuts (4)
(3)
and remove two fuel tubes (5 and 6).
(3.1) Remove and discard four preformed
packings (6.1).
(4)  Cover four fuel line connectors (7) with
caps.
(5)  Remove two brackets (8) from cylinder
head (9).
CAUTION
Do not force rocker arms all the way back with
shaft in place. This could result in damage to
push rods.
Move three rocker arms (2) up and
(6)
toward center of engine to permit
shaft (10) to be removed.
Hold three push rods (11) and loosen three
(7)
locknuts (12).
NOTE
Tag rocker arms before removal.
Remove three rocker arms (2) from three push
(8)
rods (11).
Measure inside diameter of bushing (13) in
(9)
rocker arms (2) and outside diameter of
shaft (10). Clearance between bushing (13) and
shaft (10) must not exceed 0.004-in. (0.102 mm).
Change
2
7-9

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business