Click here to make tpub.com your Home Page

Page Title: INSTALL FRONT TRANSMISSION CONTAINER MOUNT
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 9-2520-270-34
3.
I N S T A L L FRONT TRANSMISSION
CONTAINER MOUNT (1) ON
TWO OUTPUT HOUSINGS (2),
a. (H) Aline four holes (3) in front
mount (1) with four holes in output
housings (2).
b. Install four lock washers (4),
washers (5), and screws (6).
4.
USING 1/2-lNCH DRIVE TORQUE
WRENCH, TORQUE FOUR SCREWS (6)
TO 55-60 ft-lb (8mkg).
NOTE
The container has two alinement pins. They aline
holes in front and rear mounts with holes in
transmission container frame. Holes will aline
only in one position.
5. REPAIRER AND HELPER POSITION
T R A N S M I S S I O N (7) IN TRANSMISSION
LOWER CONTAINER (8).
a.
Using lifting device (9), lower
transmission (7) onto transmission
container frame (10).
(H) Aline pin (11) in frame (10)
b.
with hole in rear mount (12).
c.
Aline pin (13) in frame (10) with
hole in front mount (1).
2-160

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business