|
|
![]() TM 9-2520-270-34
1. DID INSPECTION INDICATE REPLACEMENT OF
AUXILIARY MAKEUP PUMP WAS REQUIRED?
1. WAS ANY CORRECTIVE ACTION
Corrective action:
RECORDED ON DA FORM 2404
1. REPLACE AUXILIARY MAKEUP
FOR HOSE ASSEMBLY 11628453-6?
PUMP.
2. RECORD AUXILIARY MAKEUP
PUMP FAILURE ON DA FORM 2407
AND RETURN WITH AUXILIARY
MAKEUP PUMP TO DEPOT.
I
YES
No
1, PERFORM CORRECTIVE ACTIONS RECORDED ON
DA FORM 2404.
2. WAS MAIN HOUSING ASSEMBLY CLEANED?
NO
YES
GO TO NEXT PAGE
Install coolant and time delay valve assembly. See task
1.
REPLACE COOLANT AND TIME DELAY VALVE ASSEMBLY,
2.
Install makeup pump fluid regulating valve. See task REPLACE
MAKEUP PUMP FLUID REGULATING VALVE, page 3-26.
Install auxiliary makeup pump. See task REPLACE AUXILIARY
3.
MAKEUP PUMP, page 4-482.
4.
Install power takeoff assembly. See task REPLACE POWER
TAKEOFF ASSEMBLY, page 4-140,
Assemble transmission. See task INSPECT TRANSMISSION
5.
FOR CONTAMINATION, page 4-67.
1. Assemble transmission. See
task CLEAN MAIN HOUSING
END OF TREE
ASSEMBLY, page 4-155.
END OF TREE
2-51
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |