TM 9-2520-249-34& P
brake apply rotating cam. Repeat the adjustment bolt
procedure and torque check on the right side.
122 Install left and right gaskets (1 and 6) and brake
120 Install gasket (2) and steer valve body assembly
adjustment covers (2 and 5). Secure each
(3) over guide bolts (1). Remove the guide
cover with two 3/8-16 x 23 3/4-inch bolts (3) and
bolts.
three 3/8-l6 x 1 3/8-inch bolts (4), five plain
washers and five lock-washers. Refer to FO-15
for torque and proper sequence of tightening
these bolts.
121 Install twenty-six 3/8-16 x 4-inch bolts (1), 24
plain washers and 24 lockwashers. Refer to
tightening these bolts. With all the left brake
components in the fully-released position, screw
adjustment bolt (6) in until it lightly contacts the
brake apply cam (on underside of the top cover
(5). Tighten locknut (4) against lug (3) so that
123 Install two 3/8-16 x 4-inch, headless guide bolts
the bolt and nut will remain in place if the power
(8) in the converter housing mounting pad on
train is run before brakes are given the final
the bevel gear housing. Install gasket (7) over
adjustment. Using adapter (2), (1, table 3-1) on
the guide bolts and retain it with oil-soluble
the brake apply shaft, apply torque to check for
grease. Attach sling (4) (26, table 3-1) to the
freedom of movement of the
converter housing assembly and position the
converter housing for installation on the bevel
gear housing.