Click here to make tpub.com your Home Page

Page Title: Radar Set AN/MPQ-10
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 746-10
CAUTION
Place fiberboard, cellulosic, or foam cushioning
e. Stow, block, brace, and secure equipment on
between the item and all blocking, bracing, and
the vehicles and install the canvas cover per figures 4-
strapping to prevent chafing and corrosion of the
12 and 4-13. Do not repackage.
item.
f Apply markings per paragraph 3-5 and MIL-
STD-129.
e. Apply marking to shipping containers per
4-112. Radar Set AN/MPQ-10
4-111. Radar Set AN/MPQ-4
a. Clean radar set and components using process
C-1 and dry by using procedures D-1 and D-4, as
applicable.
a. Clean radar set and components using process
C-1 and dry by using procedures D-1 and D-4, as
b. Requires no preservative.  Repaint or coat
applicable.
metal surfaces of equipment, as required, where paint
has been removed or peeled.
b. Requires no preservative.  Repaint or coat
metal surfaces of equipment, as required, where paint
c. Perform  the  following  functions  to  the
has been removed or peeled.
equipment,  as  applicable.
Excluded  are  items
contained in case(s). Pack items per paragraph 4-105.
c. Perform  the  following  functions  to  the
equipment, as applicable:
(1) Consolidate and place into cloth bags all
nuts, bolts, screws, washers, and other hardware and
(1) Consolidate electronic equipment, and
secure to the equipment from which they were removed.
place into cloth bags all nuts, bolts, screws, washers,
and other hardware; secure them to the equipment from
(2) Assemble  like  items,  i.e.,  mounting
which they were removed.
hardware, tie plates, nuts, bolts, or screws, and place in
weather-resistant  fiberboard  boxes  convenient  for
(2) Pack installation kits or tool kits as
handling.  Do not exceed weight limitation of boxes.
specified in paragraph 4-113.
Close the box and seal all seams and joints with tape
(3) Pack  all  loose  spare  parts  and
(fig 4-3). Use filament reinforced tape, as required, to
miscellaneous components.  Wrap these items with
reinforce the boxes.
corrugated paperboard and place within close-fitting,
(3) Pack wire, cable, and cord assemblies as
weather-resistant fiberboard boxes. Fill all void space
specified in paragraph 4-114.
with  cellulosic  cushioning  material  to  prevent
movement. Close the boxes and seal all seams and
(4) Check to ensure that all installed and
joints with tape (fig 4-3).
shock-mounted equipment is secured in place such as
antenna, outriggers, and tracker mount.  Check all
(4) Pack wire, cable, and cord assemblies as
locking devices, cable connectors, equipment covers,
specified in paragraph 4-114.
ventilation intakes, and exhaust parts for tightness.
(5) Recheck to ensure that all installed and
(5) Process and package items not identified
shock-mounted equipment is secured in place. Check
herein using instructions for similar-type items with the
all screws, clamps, and cable connectors for tightness.
same physical or mechanical characteristics.
(6) Fabricate a weather-resistant fiberboard
(6) Cover the radar set mounted on the
cover for OA-1256/MPQ-4A and secure in place with
vehicle carriage with the canvas cover and secure with
metallic strapping.
fasteners provided.
(7) Place 32 units of desiccant in the
d. Package radar set and components as follows:
desiccant chamber and secure in place (fig 4-10).
(1) Do not repack radar set mounted on
d. Process as follows:
vehicle carriage. Recheck to ensure that all equipment
(1) Lubricate and process generator per
is secured in place and the canvas cover is properly tied
section I of this chapter.
down.
(2) Place  the  handtools  and  technical
(2) Consolidate and pack the remaining
literature in the tool box, if space permits, or place the
components within plywood consolidation insert shipping
items within a close-fitting, weather-resistant fiberboard
containers, and block and brace to prevent movement.
box. Close the box, seal all seams and joints with tape,
Apply metallic strapping to the consolidation insert
and secure the box to the generator with the same tape.
shipping containers subsequent to packing and closure.
(3) Place each generator within a close-
e. Apply marking to shipping containers per
fitting, weather-resistant fiberboard box and secure with
and
MIL-STD-129.
metallic strapping (fig 4-11).
4-47

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business