Click here to make tpub.com your Home Page

Page Title: Figure 4-6. Shelter Skid Base with Sling Assembly Tiedown (MIL-S-55507)
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 746-10
Figure 4-6. Shelter Skid Base with Sling Assembly Tiedown (MIL-S-55507
).
(10) Use the following directions to pack each
cabinet weighing over 100 pounds with mounting
(a) Block and brace the cabinet to the base of the
facilities. Fabricate a nailed wood box or plywood box.
shipping container using 2by 4-inch lumber. Place pads
Place the cabinet on the skid base. Drill holes through
of corrugated fiberboard between the cabinet and the
the skid base and the skids to correspond with the
wood blocking material to prevent abrasion or damage.
mounting holes on the cabinet. Arrange mounting holes
(b) Secure the cabinet to the base with metallic
so when the cabinet is centered on the skid base and
strapping using anchor plates to immobilize the cabinet.
the box is assembled, there is a 2-inch clearance
To prevent abrasion, place corrugated fiberboard pads
between the cabinet, sides, ends, and top of the box.
on all surfaces of the cabinet which come in contact with
Insert the bolts through the
metallic strapping.
4-42

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business