TM 746-10
Use same preservation on outrigger height adjustment
4-48. Distributors (Water and Bituminous), Truck-
screws. Float plates may be painted or preserved same
mounted
as outriggers and screws.
Completely drain and dry all tanks, pumps, spraybars,
and piping including the heating system.
and pack in fiberboard boxes. Secure boxes in crane
a. Water tanks. Coat interior surfaces of tanks
cab.
(except those that are corrosion resistant), tank gauge
d. Process crane, components, and attachments
mechanisms, screens, and strainers as follows: use P-9
per applicable paragraphs of this chapter. Cover all
for NONPOTABLE water tanks and use P-14 for
openings into the crane cab that will permit entry of
POTABLE water tanks, and leave the drain valves open.
water with waterproof barrier material and secure in
b. Bitumen tanks. Coat interior surfaces of tanks
place with tape.
(except those that are corrosion resistant), tank gauge
e. Clean, dry, and preserve power trains, brakes,
mechanisms, screens, and strainers with P-10. Leave
steering, suspensions, and all other portions of the
the drain valves open.
mobility aspects of the crane and carrier per applicable
c. Pumps. Coat interior surfaces of the pump
paragraphs of this chapter.
casing and all parts within the casing. Spraying or
4-45. Crane Attachments
fogging will continue long enough to ensure complete
coverage. Seal openings into the pump interior with
a. Coat unpainted, unprotected metal surfaces of
tape. Use the following preservatives: VV-L-800 (P-9)
attachments including wire rope, bolts, nuts, and cable
for NONPOTABLE water pumps; MIL-C-10382 (P-14)
sheaves with P-1.
for POTABLE water pumps; and MIL-L-21260 (P-10),
b. Nest and arrange each shovel front, backhoe,
grade 30, for bitumen pumps.
piledriver lead, etc., to form a compact bundle (exclude
d. Spraybars, piping, valves, and fitting. Coat
dippers and buckets). Place wood blocks between
interior surfaces with the applicable preservatives cited
sections and secure the bundle together with 1 -inch
in c above.
metallic strapping. Pack component parts including
publications in wood, plywood, or fiberboard boxes.
Seal all openings of fiberboard boxes with tape (see
burner fuel tanks, fuel pumps, steep piping, and valves
with P-10. Seal openings with tape.
Secure box to the attachment or within bucket with
f. Bitumeters and Fifth-wheel tachometers.
metallic strapping specified herein.
Secure in the carrying position on the distributor.
4-46. Rollers, Motorized
g. Distributor charts. Unit pack distributor charts
submethod IC-3.
a. Drain rolls, water supply tanks, and sprinkler
h. Unprotected, ferrous metal surfaces. Coat with
systems and dry with dry compressed air. Spray interior
P-1.
surfaces of rolls and water supply tank with P-10. Flush
sprinkler system and coat filler and drain plugs with the
i. Systems vehicle. Clean, dry, and preserve
same preservative and secure plugs in place.
pump engine and power train, brakes, suspension,
steering, and all other portions of the mobility aspects of
b. Coat unprotected metal surfaces with P-1.
the distributors per applicable paragraphs of this
c. Clean, dry, and preserve power trains, brakes,
chapter.
steering, suspension, and all other portions of the
mobility aspect of the rollers per applicable paragraphs
4-49. Distributor, Water, Collapsible Tank
of this chapter.
a. Remove spraybar assemblies and braces and
4-47. Rollers, Towed
coat exterior surfaces with P-1.
b. Pack emergency repair items together in a
a. Remove drain plug from hoppers of pneumatic
fiberboard box.
tired rollers and drain plugs or ballast hole cover plate.
Drain and dry with dry compressed air. Spray interior
c. Coil hose and secure with twine.
surfaces of roller drums with P-10. Reinstall drain plug
d. Lay tank flat with the fittings up and caps
and cover plate.
installed. Place preserved and packed components on
b. Coat drain plugs removed from hoppers of
top of the tank around the fittings and fold tank in
pneumatic tired rollers with P-1 and place in tool box.
manner to form a compact bundle and pack in a wood-
c. Coat unprotected metal surfaces with P-1.
cleated plywood box.
4-12
|