|
|
TM 55-8145-203-13&P
b. Pull out the spring clip (1) on the left-hand shelf
support beam (2). With clip pulled out, slide the
beam up until the rivets (4) can be disengaged
from the tear-drop cutouts in the vertical shelf
support (3).
c. Repeat the above step on the right-hand shelf
support beam.
2
d. Move both support beams up or down to the
1
desired position.
e. Secure the left-hand support beam by pulling out
the spring clip (1) and inserting the rivets (4) into
the tear-drop cutouts on the vertical shelf support
(3). Lower the support beam (2) until rivets (4)
3
completely engage the vertical shelf support (3).
Release the spring clip (1) to secure the support in
place.
f. Repeat Step e on the right-hand support beam.
g. Repeat Steps e and f until all three support beam
4
assemblies have been adjusted to the same height.
VIEW FROM
REAR
h. Install shelves on top of support beams.
i. There are two shelf options for a complete shelf.
j. Longitudinal (front to back) shelf option requires
1
two shelf panels (1) side by side with a minimum
of three shoring beams (2) for support.
VIEW FROM
TOP
2
(DOORS OPEN)
LONGITUDINAL
(FRONT TO BACK)
2-6
Change 1
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |