4920-01-139-4534">

 

Click here to make tpub.com your Home Page

Page Title: Positioning shop equipment
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 55-4920-439-13&P
h. Position bar (9) across top of other ECU opening
and install bolts (8).
i.  Position bar (10) across bottom of other ECU
opening and install bolts (8).
2-3. Positioning shop equipment. The following procedures and recommended sequence for moving equipment will be
observed.  The new positions in which the equipment will be located on the expanded half of the shelter are also
identified.
a. Positioning cabinets, bin storage for operation.
Procedures for moving both cabinets are identical.
1. Remove five bolts (1) from each of the two
brackets (2) located on both sides of the cabinet (3).
2-6 Change 1

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business