TM 55-4920-437-13&P
4. After cable (8) has been cleaned and rolled,
store in storage bin (9).
f. Removal of external ground rod.
1. Remove
external
ground
rod
IAW
TM
10-5411-201-14.
2. Store ground rod assembly in storage chest.
2-10. Bolts and washers for equipment tiedown.
CAUTION
Care must be taken to ensure that the proper bolts and washers are used to secure
equipment when shop is transported. Lack of correct hardware could cause
extensive damage to equipment or the shelter.
a. Remove cotton bags with tie down bolts and washers from shop storage chest.
b. Inspect hardware for damage or missing parts.
c. Check out a tor que wrench from tool crib.
d. All bolts will be tightened to the specific torque value given. See App F.
Change 1 2-21
|