|
|
TM 55-4920-437-13&P
h. Position bar (9) across top of other ECU opening
and install bolts (8).
i. Position bar (10) across bottom of other ECU
opening and install bolts (8).
2-3. Positioning shop equipment for operation. The following procedures and sequence for moving equipment will be
observed. The new positions in which the equipment shall be located on the expanded half of the shelter are also
identified.
WARNING
Four people are needed when moving or lifting the Environmental Control Units
(ECUs). Each unit weighs approximately 270 pounds. Trying to move or lift an
ECU without sufficient help can cause serious injury to personnel.
2-6 Change 1
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |