|
|
TM 55-4920-437-13&P
d. Counterbalance Cable Removal.
1. After shop erection is complete (AND
COUNTERBALANCE CABLES ARE SECURED),
remove three screws (1) from cable retainer block (2).
2. Let cable (3) and retainer bl ock (2) hang
loose next to spring housing (4).
3. Reinstall retainer block screws (1) and
secure.
e. Shop is now ready for reconfiguration of
equipment to operational mode.
NOTE
All equipment or tools secured to the
floor or walls of the shelter must be
carefully tightened to specific torque
limits. See Appendix F.
SECTION II. PREPARING SHOP FOR OPERATION
2-2. ECU Shelves, lowering procedures.
NOTE
The following procedures apply only
if the ECU are to be installed.
NOTE
(For shelter P/N 136-0000-101) One
ECU opening is located in the fold-
out end wall and one ECU opening is
located in the fold-out side wall.
(For shelter P/N 5-4-2828-1) Both ECU
openings are located in the fold-out
end walls. One ECU opening in each
fold-out end wall.
a. Remove four plugs (1) on outside of each shelf
(2).
Change 1 2-3
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |