TM 55-4920-433-13&P
2-12.
Storage procedures.
In the event the
Pneudraulic Shop is to be placed in storage the
provisions  of  TM  740-90-1,  TM  743-200-1  and
applicable shop equipment TM will be followed.
2-13. Striking the shelter. Procedures for striking the
shelter are contained in TM 10-5411-201-14.
In
addition, the following "Supplemental Instructions" will
be observed.
a. Remove screws (1) at both corners of foldout
floor.
b.
Install cable (3) and retainer block (2) with
screws (1).
NOTE
When floor is lowered, (to allow roof
clearance for folding) the devices
securing
fold-out
floor
counterbalance
cables
can
be
disengaged.
Change 1 2-32

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business