TM 55-4920-433-13&P
4. After cable (8) has been cleaned and
2. Replace dust cap (4) on P1 receptacle (5).
rolled, store in storage bin (9).
3. After
qualified
electricians
have
disconnected male end of cable (6) from power
distribution panel (7) inspect, clean cable (8) with rag
and roll.
f. Removal of external ground rod.
1. Remove external ground rod IAW TM 55-5411-201-14.
2. Store ground rod assembly in storage chest.
2-10. Bolts and washers for equipment tiedown.
CAUTION
Care must be taken to ensure that the proper bolts and washers are used to secure equipment
when shop is transported. Lack of correct hardware could cause extensive damage to
equipment or the shelter.
a. Remove cotton bags with tie down bolts and washers from shop storage chest.
b. Inspect hardware for damage or missing parts.
c. Check out a torque wrench from tool crib.
d. All bolts will be tightened to the specific torque value given. See App F.
CAUTION
Torque values provided must be respected to prevent possible damage to equipment or the
shelter. Improper procedures could result in extensive damage to government property.
Change 1
2-21
|