h. Position bar (9) across top of other ECU opening
and install bolts (8).
i.  Position bar (10) across bottom of other ECU
opening and install bolts (8).
2-3. Positioning shop equipment for operation. The following procedures and recommended sequence for moving
equipment will be observed. The new positions in which the equipment will be located on the expanded half of the
shelter are also identified.
a. Positioning cabinet, w/drawers for operation.
1. Remove five bolts (1) from each of the two
brackets (2) located on both sides of the cabinet (3).
2-6
Change 1

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business