TM 55-4920-433-13&P
5. (For shelter P/N 5-4-2828-1) Close slide stops (1) against counterbalance cables (2) on both cable reels
(3).
6. Securing the counterbalance cable will allow removal of the counterbalance cables attached to each end
of fold-out floor.
7. Continue with remaining procedures outlined in TM 10-5411-201-14 for final erection of the shelter.
Change 1 2-2.1/(2-2.2 blank)
|