2. As soon as there is enough floor area (4),
the personnel inside will move to the expanded side of the
shelter raising the roof with extended support struts (2).
3. Once the struts (2) are totally supporting
the roof panel (1), the end walls (5) are swung open.
WARNING
The fold-out floor counterbalance cables must be secured in the cable housings prior to raising
the shelter floor from its lowered position to its level position. If the counterbalance cables are
not secured, the counterbalance cables will remain under tension. DO NOT attempt to remove
cables if the counterbalance cables are not secured. Removing cables while under tension could
cause serious injury to personnel.
4.  (For shelter P/N 136-0000-101) Raise
upper lockout plates (6) on each end wall and install
upper lockout pins (7) into the cable housings.
2-2
Change 1

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business