|
|
TM 55-4920-426-13&P
Section VI. PREPARATION FOR STORAGE OR SHIPMENT
3-177
TEST STAND PREPARATION
3-177
if using preservative MIL-H-6083A, prepare test stand as follows:
1.
Drain the reservoir, open the drain valve.
After draining reservoir, close drain valve
2.
3.
Drain the low pressure filter, remove drain plug.
4,
After draining the low pressure filter, replace the drain plug.
Fill the test stand reservoir at the filler neck with preservative fluid MIL-H-6083A until the reservoir
5.
fluid level indicator on the instrument panel indicates 3/4 to 7/8 full.
Operate the test stand for approximately 5 minutes to fill the system with preservative fluid. Refer to
6.
7.
Secure the hoses on the retainer hooks. Check the external hydraulic connections are capped.
Secure all quick release fasteners and the gage panel door.
Tag the control panel to state: "System preserved with MIL-H-6083A. Drain and service with MIL-
8.
H-83282 or MIL-H-5606."
Secure all quick release fasteners and the instrument panel door.
9.
10.
The test stand is now ready for storage or shipment, it does not need an external packing case.
3-234
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |