|
|
TM 55-4920-426-13&P
3-70
HIGH PRESSURE PUMP INSPECT
3-70
Inspection
This task covers:
INITIAL SETUP
Personnel Required
68H Aircraft Pneudraulic Repairman
INSPECTION
Inspect pump for a cut "O" ring.
a.
Inspect pump for cracks.
b.
c.
Check for leaks in plumbing (tighten tubing nuts and fittings).
Replace damaged pump (Para. 3-72).
d.
END OF TASK
3-112
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |