4920-00-176-9236 ">
|
|
TM 55-4920-424-13&P
Item
Interval
Method
Inspection and Maintenance
Grounding Wires
90 Days
Visual
a. Check wires for
and Post
fraying.
b. Check attaching nuts and post for
stripped threads.
c. Check wire terminals, nuts, and
washers for corrosion, and for security of
attachment.
Lubrication
90 Days
Visual
a. Check that a lubrication fittings
are installed and undamaged.
See figure E-13 for location of
lubrication fittings.
Exhaust Duct
180 Days
Visual
a. Inspect all welds for
Assembly
cracks.
Frame
180 Days
Visual
a. Examine all structural
components of the trailer,
such as angles, beams,
supports, and welded
sections for cracks,
weakness, and failures.
b. Check all components for
security of attachment.
c. Check all attaching
parts for stripped
threads and corrosion.
d. Check reflectors for
broken glass.
e. Check all stowage equipment
for security of attachment.
Figure E-14. Table of Periodic Inspection and Maintenance (Sheet 5 of 6)
Change 2 E-33
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |