4920-00-176-9236 ">

 

Click here to make tpub.com your Home Page

Page Title: PREPARATION FOR STORAGE.
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 55-4920-424-13&P
g. Connect battery.
h. Push in MAIN POWER circuit breaker. (See figure E-3.)
i. Move START-RUN-OFF switch to RUN.
j. Move BOOST PUMP switch to ON. Boost pump will operate and preservative oil will flow through line.
k. Move BOOST PUMP switch to OFF when preservative oil flows out of line.
I. Move START-RUN-OFF switch to OFF.
m. Pull MAIN POWER circuit breaker.
n. Disconnect battery.
o. Securely cap APU fuel supply line.
p. Reconnect tank-to-pump fuel supply line to tank fitting.
q. Remove fuel tank drain fitting and drain all preservative oil from tank. Reinstall drain fitting.
r. Wipe any spilled oil from stand surface and from stand components.
2-9.
PREPARATION FOR STORAGE.
2-10. The check stand must be prepared for storage, as follows:
a. Perform fuel system preservation in accordance with instructions in paragraph 2-8.
b. Disconnect power cable from battery.
c. Remove battery from stand; forward battery to an applicable storage area.
d. Remove fire extinguisher from stand; forward extinguisher to an applicable storage area.
e. Cover all cable connectors, and secure cables and harnesses to convenient structures.
f. Remove both started generators from stand; forward starter generators to an appropriate storage area.
g. Cover all openings on stand equipment.
Change 2 E-13

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business